The 2026.4 update cuts down the manual stuff that slows teams down every day.
Field Reports That Actually Fit the Job
Not every job wraps up in a single day. And nobody wants to stitch together five reports just to see what happened over the course of the week on a project.
Now you can build Field Reports across multiple days and pull everything into one report instead of piecing it together manually.
You can also create field reports to include just the crews or employees you actually want. Easier to read. Easier to send out.
We also cleaned up PDF exports, so reports don’t break across pages anymore.
Keep Unqualified Workers Off the Jobsite
A lot of companies are still checking certifications manually. Stuff slips through.
Now you can tie certification requirements directly to projects, cost codes, or equipment. If someone’s cert is expired or missing, they can’t clock into that work.
Simple way to avoid problems before they happen.
Faster Equipment Management
Managing equipment gets messy fast when you’ve got a lot of equipment.
Now you can:
- Assign checklists to multiple pieces of equipment at once
- Hide equipment that’s already scheduled so you don’t double-book it
- Get text alerts when inspections come back with issues
Small changes, but they save time and cut down on avoidable headaches.
Learn more about Equipment Inspections here.
The Bottom Line
Nothing flashy here. Just better control over reporting, compliance, and equipment without adding more admin work for the office or field teams.